Showing all 14 results

48MW Pratt & Whitney FT8

YoM: 1995
Fuel: Dual (Gas and Oil)
1st Unit
Gas Turbine
Power Plant Gas Turbine: PW FT8-1 Twin Pac (Double-Connection), Year: 1995
Power: 48MW
Voltage: 11kV
Hours: 18,000 Hours
Other Parts: Transformer, 110kV Up-Voltage Plant, Discharge Oil Pump,
Sewage Oil Pump, Fuel Oil Pump Room (MCC), year: 2010, hours: 10 Hours

SOLD: 12.9 MW 2017 Siemens SGT 400 Natural Gas Turbine 2017

With full warranty BRAND NEW (from a cancelled project)
• Combustor Standard: Dual Fuel DLE
• Power: 12,9MW and 50Hz
• Testing: Factory tested
• Hours Operation: No operational running
• Storage Location: EMEA
• Delivery: FAS port of export
Price: Upon request
Delivery : Immediate
*5 Siemens SGT 400 Natural Gas Turbines Available

SOLD: 5 (five) UNUSED FT-8 Mobile PAC Gas turbine 30 MW

  • Installed in 14 countries worldwide
  • Provides reliable power ranging from single-unit applications to multi-unit sites
  • 30 MW mobile power plant
  • Environmentally compliant
  • Easily installed within a small footprint with minimal site requirements
  • EU and GOST certified

SOLD: Mini power plant with turbine gas

HITACHI JAPAN

34,000Kva
2015
OPERATED: 695 HOURS (ALSO AS NEW!)
In 695 hours this was produced: 18.4MW of electricity

CAN SUPPLY POWER FOR A CITY MORE THAN 5000 HOUSES OR 20,000 PEOPLE!

2,000 kWA Diesel engine generator (2MW), 2 Units available

Original price: USD 1,550,000 / each
Current price: USD 950,000 / each CIF Buyer’s Main Port.
Condition: Although the machine has not been used yet, the Japanese Government bought the units in 2011 to deal with the Big Earthquake, but because the power grid was recovered quickly, it was not needed, and now for sale in its current ”AS IS” condition.
Payment Term: 100% by TT Seller’s bank after signing the contract.
Delivery: In one 40FT container (each machine)

Rolls Royce RB211-24G 24872 KW Gas Generator, Dual FuelOut Of Stock

SOLD: Rolls Royce RB211-24G 24872 KW Gas Generator, Dual Fuel

Rolls Royce RB211-24G 24872 KW Gas Generator, Dual Fuel

Dual Fuel means the turbine can be operated with either gas or diesel. After the last complete overhaul, the turbine has only run for 7000 hours, Ie the turbine is in optimum condition.

6 x New – 17,55 MW, three fuel GAS / DFO / LFO

6 x New – 17,55 MW, three fuel GAS / DFO / LFO

The units have electrical efficiency of 47.2%.

It is also of great advantage that TRI Fuel Units, i.e. the units can be operated both heavy fuel (HFO), diesel and also gas.

81 MW GE Gas Turbine

81 MW GE Gas Turbine

19.990.000

81 MW GE Gas Turbine Set Type PG6111, Plant is ready for inspection!

Purchase Price is unbeatable!

FOB delivered 19,990,000 Euro only

Location Japan

See enclosed PDF set.